Bandimex Preformed Clamps – galvanized, width: 16,0 mm – 5⁄8″, inside diameter: 38 mm – 1 1⁄2″

100 pieces/box
galvanized
width: 16,0 mm – 58
thickness: 0,75 mm – .030″
inside diameter: 38 mm – 1 12
weight: 4,7 kg

Cat.No.: V 305

Description

material

galvanized

packing unit

100 pieces

width

16,0 mm – 58

thickness

0,75 mm – .030″

inside diameter

38 mm – 1 12

weight 4.7 kg

Instruction Performed Clamps

Montageanleitung Vorgefertigte Schellen - Step 1Apply with the Bandimex Tool W 001 and Bandimex Adapter V 001 (a) or V 050 (b).
Place Bandimex Tool in vise, put Bandimex Adapter on nose of tool. Slip Preformed Clamp in tool and grip tail end with excenter lever.

Montageanleitung Vorgefertigte Schellen - Step 2Insert hose into clamp and apply tension. To control tensioning, hold thumb on that side of buckle where band enters. When band stops moving through buckle, maximum tension has been applied.

Montageanleitung Vorgefertigte Schellen - Step 3Roll hose over until shear hook engages behind buckle edge, at the same time reversing handle approx. half turn (depending on type and size of hose).

Montageanleitung Vorgefertigte Schellen - Step 4(a)
Pull on cutter lever to cut band.

Montageanleitung Vorgefertigte Schellen - Step 5(b)
Turn disc by hand until tight. Put ratchet wrench on hex nut and operate until band is sheared off.

Montageanleitung Vorgefertigte Schellen - Step 6The finished Bandimex Preformed Clamp requires no hammering or crimping.

Instruction Bandimex Air Tool V 440

Anleitung Druckluftwerkzeug V 440The BANDIMEX air tool is an air controlled, automatic tensioning tool for applying BANDIMEX performed clamps.
Operated by pedal – both hands are free to manipulate the object to be clamped.
An ideal, proven tool to clamp hose, cables and ropes of various constructions with outer diameters of 10 to 200 mm.
Each clamp is pulled down with exactly the same preset pressure in seconds.

BANDIMEX performed clamps come in 21 diameters and combinations of 5 band width, a total of 38 various clamps are available. If this is not enough on request we can also manufacture additional combinations of diameters and widths.

Installation of air tool

Screw down base plate to the work bench in such a manner that the tensioning head has sufficient distance to the edge of the bench to allow easy and unobstructed mounting of clamps on all sizes hose.
The air inlet is a ⅜“ male thread with a mounted nipple suitable for quick connect coupling ID 7,2 mm. Pressure setting at the incorporated service unit should not be less than 87 psi (6 bar), and not more than 116 psi (8 bar), it is set at 102 psi (7 bar), when tool leaves factory.
Fill vessel of oiler (service unit) with special oil for service units (e.g. Festo OFSW-32), adjust set screw of oiler to obtain minimum oil mist in air stream. Keep insides of aluminium guide rails well greased with Molykote or other high grade grease. Check the two cutter blade screws for tightness once in a while.
The footpedal may be screwed to the floor.

Adjusting functions

On the tables and pressure gauges settings are shown in ‚bar‘ and ‚psi‘. For exact adjusting ‚psi‘-settings should be employed.

1. Pull Pressure

Step on pedal – piston is pulling in (keep the pedal down!) – turn knob and set pressure reading on the gauge to the pressure required according to band width of clamp (refer to schedule) - loosen counter nut on top of knob before turning, and fasten again after setting

2. Pull Speed

Loosen counter nut
Slower: Turn screw to the right
Attention: Don’t turn the screw past stop
Faster: Turn screw to the left
Press down pedal repeatedly while adjusting until requested speed is obtained.

3. Timer

This unit regulates the period of time between beginning of cycle (pressure build-up), and release of the pressure, and rules the time used for applying a clamp. When the clamp is pulled down and piston stops at the set reading, the pressure should remain for 1 or 2 seconds to allow the clamp to settle.
Less time: Turn the knob to the right
More time: Turn the knob to the left
Max. time delay: 10 seconds
The timer is set at approx. 2 seconds by manufacturer. (Depends on length of pull down of clamp tail.)

4. Hold Pressure

In order to keep the clamp from losing tension during the cut-off operation, and to guarantee a secure locking of the buckle, a certain amount of pressure must be maintained in the cylinder. This pressure varies according to width of band and the nature (composition) of the hose (refer to schedule), and is set in the same manner as described under 1., but after the timer has released the pull pressure.

instruction air tool V 440 Detail

Band width
of clamp
Pull Pressure
bar
Pull Pressure
psi
Hold Pressure
bar
Hold Pressure
psi
140,9130 - 0.350 - 5
382,1300 - 0.350 - 5
123,0420 - 0.350 - 5
583,8530 - 0.350 - 5
344,6650 - 0.350 - 5

For type 316 steel (CrNiMo) use 10% less, for Hi-C steel 30% less pull pressure.
The above values for pull and hold pressure are approximate.
They may vary according to the types of hose and couplings applied.

Operating Instruction

  1. Push tailed end of preformed clamp into tensioning head.
  2. Step on pedal (keep depressed until clamp has been cut-off)
  3.   3. After timer has released pull-up pressure (this moment will be marked when the air will deflate from the tool with a hiss) and the value for the hold pressure will be shown on the pressure gauge on right side of panel, roll up hose together with clamp. After roll-up, the cutter hook will engage on top edge of buckle.
  4. Pull forward cutter lever – cut off clamp.
  5. Release pedal – piston returns – remove band tail.

KEEP PEDAL DEPRESSED UNTIL CLAMP HAS BEEN CUT OFF!

Instruction Bandimex Automatic Air Tool V 800

Anleitung vollautomatisches Druckluftwerkzeug V 800The BANDIMEX air tool is an air controlled, full automatic tensioning tool for applying BANDIMEX performed clamps. Operated by pedal – both hands are free to manipulate the object to be clamped.
The tool’s control panel allows optimal adjustment for various kinds and sizes of hoses.
An ideal tool to clamp hose, cables and ropes of various constructions with outer diameters of 10 to 200 mm.
Each clamp is pulled down with exactly the same preset pressure in seconds.

BANDIMEX performed clamps come in 21 diameters and combinations of 5 band width, a total of 38 various clamps are available. If this is not enough on request we can also manufacture additional combinations of diameters and widths.

Installation of air tool

Screw down base plate to the work bench in such a manner that the tensioning head has sufficient distance to the edge of the bench to allow easy and unobstructed mounting of clamps on all sizes hose.
The air inlet is a ⅜“ male thread with a mounted nipple suitable for quick connect coupling ID 7,2 mm. Pressure setting at the incorporated service unit should not be less than 101 psi (7 bar), and not more than 116 psi (8 bar), it is set according to these values, when tool leaves factory.
Fill vessel of oiler (service unit) with special oil for service units (e.g. Festo OFSW-32), adjust set screw of oiler to obtain minimum oil mist in air stream. Check the two cutter blade screws for tightness once in a while. The footpedal may be screwed to the floor.

Adjusting functions

On the tables and pressure gauges settings are shown in ‚bar‘ and ‚psi‘. For exact adjusting ‚psi‘-settings should be employed.

1. Pull Pressure

Step on pedal – piston is pulling in (keep the pedal down!) – turn knob and set pressure reading on the gauge to the pressure required (refer to schedule!)
- loosen counter nut on top of knob before turning, and fasten again after setting

2. Timer I

This unit regulates the period of time between beginning of cycle (pressure build-up), and switching to hold pressure. The setting is very accurate and individually adjustable for each hose size. We recommend to take more time the larger the hoses are; so it’s possible to re-adjust the hose before cutting.
When the clamp is pulled down and piston stops at the set reading, the pressure should remain for 1 or 2 seconds to allow the clamp to settle.

3. Pull Speed

Regulates the speed of piston.
Slower: Turn screw to the right
Attention: Don’t turn the screw past stop
Faster: Turn screw to the left
Press down pedal repeatedly while adjusting until requested speed is obtained.

4. Hold Pressure

In order to keep the clamp from losing tension during the cut-off operation, and to guarantee a secure locking of the buckle, a certain amount of pressure must be maintained in the cylinder.
This pressure varies according to width of band and the nature (composition) of the hose (refer to schedule), and is set in the same manner as described under 1., but after the timer has released the pull pressure.

5. Timer II

This unit regulates the period of time between switching to hold pressure and automatically cut-off operation. The setting is very accurate and individually adjustable for each hose size. We recommend to take more time the larger the hoses are; so it’s possible to re-adjust the hose before cutting.

instruction automatic air tool V 800 Detail

Guideline for Stainless Steel (CrNi)

Band width
of clamp
Pull Pressure
bar
Pull Pressure
psi
Hold Pressure
bar
Hold Pressure
psi
140,690 - 0,350 - 5
381,7250 - 0,350 - 5
122,5370 - 0,350 - 5
583,3480 - 0,350 - 5
344,1600 - 0,350 - 5

For type 316 steel (CrNiMo) use 10% less, for Hi-C steel 30% less pull pressure.
The above values for pull and hold pressure are approximate.
They may vary according to the types of hose and couplings applied.

Operating Instruction

  1. Push tailed end of preformed clamp into tensioning head as far as possible.
  2. Step on pedal (keep depressed until clamp has been cut-off)
  3. After timer has released pull-up pressure (this moment will be marked when the air will deflate from the tool with a hiss) and the value for the hold pressure will be shown on the pressure gauge on right side of panel, roll up hose together with clamp and position buckle under the cutter hook. After roll-up, the cutter hook will engage on top edge of buckle.
  4. When preselected time has passed at the timer of hold pressure, Tool will cut off the tail of clamp automatically
  5. Release pedal.
  6. Step on pedal again – piston returns – remove band tail.

KEEP PEDAL DEPRESSED UNTIL CLAMP HAS BEEN CUT OFF!

to apply with following products: