Bandimex Tool

to apply Bandimex Band, L-Band, L-Band Plus, Buckles, L-Clips and Preformed Clamps
Tensioning capability over 1,0 t

Cat.No.: W 001

Description

Tensioning capability over 1,0 t, to apply Bandimex Band, L-Band, L-Band Plus, Buckles, L-Clips, Preformed Clamps

packing unit

1 piece

colour

black

weight 2.0 kg

Instruction Band and Buckle

Montageanleitung Band und Schlaufen - Step 1Pull buckle on band, ears pointing towards end of band. Form clamp, holding band on band, then push buckle back over the doubled band, bending the end approx. 1″ under buckle.

Montageanleitung Band und Schlaufen - Step 2For heavy duty jobs double wrap band.

Montageanleitung Band und Schlaufen - Step 3Place band in tool, push down on gripper with thumb, tension clamp by turning handle. Maximum tension is reached when band stops moving through buckle.
When required tension has been applied, roll tool over buckle, at the same time reversing handle carefully approx. half turn to avoid breakage. There is no loss of tension, if handle is not reversed too much.

Montageanleitung Band und Schlaufen - Step 4Pull on cutter lever, band is cut off to correct length.

Montageanleitung Band und Schlaufen - Step 5Hold stub of band with thumb, hammer it flat over bridge of buckle, complete clamp by hammering ears over stub.

Montageanleitung Band und Schlaufen - Step 6

Instruction Performed Clamps

Montageanleitung Vorgefertigte Schellen - Step 1Apply with the Bandimex Tool W 001 and Bandimex Adapter V 001 (a) or V 050 (b).
Place Bandimex Tool in vise, put Bandimex Adapter on nose of tool. Slip Preformed Clamp in tool and grip tail end with excenter lever.

Montageanleitung Vorgefertigte Schellen - Step 2Insert hose into clamp and apply tension. To control tensioning, hold thumb on that side of buckle where band enters. When band stops moving through buckle, maximum tension has been applied.

Montageanleitung Vorgefertigte Schellen - Step 3Roll hose over until shear hook engages behind buckle edge, at the same time reversing handle approx. half turn (depending on type and size of hose).

Montageanleitung Vorgefertigte Schellen - Step 4(a)
Pull on cutter lever to cut band.

Montageanleitung Vorgefertigte Schellen - Step 5(b)
Turn disc by hand until tight. Put ratchet wrench on hex nut and operate until band is sheared off.

Montageanleitung Vorgefertigte Schellen - Step 6The finished Bandimex Preformed Clamp requires no hammering or crimping.

to apply with following products: